Installing the main distribution frame

26 Installing and Connecting the MDF and Telephones

Cable clamps are required in installations with cable slack managers. At the rear of the media
gateways, install two cable clamps using the screws provided. These clamps hold the 25-pair
input/output or MDF cables in place.

Figure 8: Cable routing through Cable Slack

Manager—example for MCC1 Media Gateway

on page 26 and

Figure 9: Cable routing through

Cable Slack Manager—example for SCC1 Media Gateway

on page 27 show cable clamp

placement and cable routing.

Figure 8: Cable routing through Cable Slack Manager—example for MCC1 Media Gateway

Figure notes:

1. Top of Media Gateway
2. Cable Slack Manager
3. Cable Clamp

4. Spare Center Troughs
5. Media Gateway Trough for

Port Cables