Installing Cable Slack Managers

Issue 3 January 2008

25

Installing Cable Slack Managers

Run excess cables on an upper cable ladder (if the MDF connectors are on top) or route them
through a cable slack manager that is placed next to the MDF.

To install cable slack managers:

1. Place the Z113A Cable Slack Manager against the wall under the MDF. See

Figure 9: Cable routing through Cable Slack Manager—example for SCC1 Media
Gateway

on page 27. Align the left side of the cable slack manager with the first terminal

block of the trunk/auxiliary field.

2. Place the next cable slack manager beside the previously installed unit. Align the tabs and

interlocks and snap the units together.

3. Repeat Step 2 until all cable slack managers are installed.

Note:

Note:

Nine 1/4-inch (0.63 centimeter) holes are provided in a cable slack manager base
if earthquake mounting is required. If a base is mounted on an uneven floor,
shims may be required for leveling and to assure proper fit of the covers.

Holes are provided in the sides of the base for bolting cable slack manager
together. Obtain bolts and shims locally.

4. An example of how the media gateway cables route through the cable slack manager is

shown in

Figure 8: Cable routing through Cable Slack Manager—example for MCC1 Media

Gateway

on page 26.

Table 1: Apparatus mounting frame ordering information

Code number

Description

Comcode

1110A2

Apparatus Mounting

Frame

104032495

1110C1

Cable Support Assembly

104175120

1110A1

End Dress Panel

104176268

2110A1

Top Dress Panel

104176276

2110B1

Bottom Dress Panel