Chapter 4: Media gateway connections to the MDF

Once the main distribution frame (MDF) is installed and wired, you must connect the media
gateways to the MDF.
Run excess cables on an upper cable ladder (if the MDF connectors are on top) or route them
through a cable slack manager that is placed next to the MDF. For more information, see

Installing Cable Slack Managers

on page 25.

This section has information about

Equipment room cabling labels

on page 33

Cable routing guidelines

on page 36

Trunk cables among network interface, sneak fuse panel, and media gateway

on page 38

And procedures for:

Installing cables between media gateway and MDF

on page 38

Installing connector cables between auxiliary cabinet and MDF

on page 39

Equipment room cabling labels

The purple port label shown in

Figure 12: Equipment room cabling labels

on page 34 is

installed on both ends of the 25-pair cables connecting to the trunk/auxiliary field and/or
distribution field.