Required tools and equipment, Specific sg-1 chassis installation requirements, Location requirements – ADC SG-1 User Manual

Page 17: Required tools and equip, Sg-1 c

Advertising
background image

June 30, 2006

Chapter 1: Overview

SG1-UM-8500-03

1-5

R

EQUIRED

T

OOLS

AND

E

QUIPMENT

The following tools are required to install the SG-1 chassis:

• Grounding or ESD-preventive wrist strap

• No. 2 Phillips-head screwdriver

• Multimeter (for continuity testing)

• Wire stripper

• Wire-wrap tool

• Box cutter

• #26 AWG wire

S

PECIFIC

SG-1 C

HASSIS

I

NSTALLATION

R

EQUIREMENTS

The SG-1 chassis dimensions are:

• Height of 17.50 inches (44.4 cm) (10U)

• Width of 19.0 inches (44.8 cm) without rack adapters attached to the left and right side of the unit

• Depth of 11.4 inches (28.9 cm)

Location Requirements

To install the chassis in an equipment room or central office:

• Install in a 19-inch, 23-inch, 24-inch, or 600 mm rack using the customer provided rack adapter brackets.

• Allow a 1-inch minimum clearance between the chassis to provide for proper air flow for cooling.

Use the following card types in the SG-1 chassis:

• Fast Ethernet card in slots 1 through 16

• Gigabit Ethernet card in slots 1 through 16

• ATM card in slots 1 through 16

• Rear I/O card on the rear of the chassis in slots 1 through 16

When selecting system components, consider future expansion of your SG-1 with items in

Table 1-3

as possible

options.

!

IMPORTANT

Observe the clearances specified below in “Location Requirements” to provide proper air flow
for chassis cooling.

Advertising