Metrohm 920 Absorber Module User Manual
Page 36
Advertising
4.3 Dosino for ultrapure water
■■■■■■■■■■■■■■■■■■■■■■
28
■■■■■■■■
920 Absorber Module
Port 2
6.1805.040
1 Mounting the FEP tubing
Tighten the FEP tubing on port 2 of the dosing unit.
2 Routing the FEP tubing out of the instrument
Guide the loose end of the FEP tubing out of the 920 Absorber Mod-
ule through one of the capillary openings on the back panel of the
instrument.
Connecting port 4
Prerequisites:
■
The PTFE capillary (6.1803.030) is threaded in through the thread
adapter (6.1618.020) and the Dosino holder (6.2057.230).
■
The coupling is installed on the end of the capillary.
Advertising