Metrohm 920 Absorber Module User Manual
Page 46
Advertising
4.3 Dosino for ultrapure water
■■■■■■■■■■■■■■■■■■■■■■
38
■■■■■■■■
920 Absorber Module
3 Fill the adsorber tube with a little cotton and adsorber granulate and
seal it with the plastic cover.
4 Place the adsorber tube into the large opening of the bottle attach-
ment and fasten it in place with the SGJ clip.
5 Seal the M8 opening with a stopper.
Advertising