5 start-up – Metrohm 920 Absorber Module User Manual

Page 87

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

5 Start-up

920 Absorber Module

■■■■■■■■

79

5 Start-up

All of the Combustion IC system components have to be completely
installed before putting the 920 Absorber Module into operation; this
means:

The Combustion Module including ABD and optional sampler (MMS
5000) and, if necessary, the LPG/GSS Module is installed according to
the specifications in the Combustion IC operating instructions from
Analytik Jena.

The 920 Absorber Module is installed according to the specifications in
the manual for the 920 Absorber Module and is connected to the
Combustion Module.

The 930 Compact IC Flex (2.930.2560) is installed according to the
specifications in the manual for the ion chromatograph and is connec-
ted to the 920 Absorber Module.

The ion chromatograph is connected to a computer where the
MagIC Net software is installed.

Putting the Combustion IC system into operation

1 Starting the software

Switch on the PC and start the software MagIC Net.

Enter user name and password.

The software starts and shows the Workplace program part.

2 Switching on the instruments

Switch on the Combustion Module: the Combustion Oven and
the ABD, the MMS 5000 sampler or the LPG/GSS Module, if it is
present.

Switch on the Combustion IC system.

Switch on the ion chromatograph.
MagIC Net detects all of the instruments and asks if they are to be
saved to the device table.

Confirm all of the prompts with [Yes].

Advertising