8 connecting the drainage tubing and leak sensor, Connecting the drainage tubing and leak sensor – Metrohm 920 Absorber Module User Manual

Page 78

Advertising
background image

4.8 Connecting the drainage tubing and leak sensor

■■■■■■■■■■■■■■■■■■■■■■

70

■■■■■■■■

920 Absorber Module

Inserting the absorber tube into the instrument

Insert the absorber tube into the instrument:

1 Hang the absorber tube on the two brackets on the right inner side

wall.

Next step

Connect the
Capillary/
tubing at …

… to

side

Secure the outlet of the combustion oven (see Chapter 4.10.2, page
76)

4.8

Connecting the drainage tubing and leak sensor

The leak sensor detects leaking liquid that collects in the instrument's base
tray. Liquid that leaks in the bottle holder or in the detector chamber is
routed to the base tray using drainage tubing and is detected there.

If the leak sensor detects a leak in the IC system, the IC instrument is
switched off and a warning is output in the software.

The leak sensor functions properly only if the following preconditions are
met:

The drainage tubing is connected.

The leak sensor connection cable is inserted into the leak sensor con-
nection socket.

The Combustion IC system is switched on.

Advertising