6 installing the eluent path, 2 connection mpak – high-pressure pump, Installing the eluent path – Metrohm 761 SD Compact IC User Manual

Page 25: Connection mpak, High-pressure pump

Advertising
background image

2.6 Installing the eluent path

761 SD Compact IC / Instructions for Use 8.

761.1043

17

2.6

Installing the eluent path

2.6.1

High-pressure pump – Removing the transport security
screws

The pump head is locked with three transport security screws 13 in or-

der to prevent damage to the pump drive during transport (see Figure

2). These transport security screws must be removed before placing

the high-pressure pump into operation. Also remove the red sticker at-

tached to the pump head 24.

The three transport security screws must be refitted every time before

a major transport operation of the pump in order to avoid damage to

the pump head.

2.6.2 Connection

MPak

high-pressure pump

The eluent MPak must be connected to the pump head 24 via the tub-

ing connection 23 6.1837.000.

First connect the end at the pump head and then, not before, connect

the end at the MPak output. The eluent will start to drain out if you

connect the end at the MPak output first.


Procedure when connecting the tubing connection:

1 Connect the tubing connection using the PEEK

coupling to the pump head

Connect the tubing connection 23 6.1837.000 using the

PEEK coupling 55 (already pre-fitted to the tubing) to the

capillary inlet of the pump head 24.




2 Connect the tubing connection to the eluent MPak

outlet

Connect the other end of the tubing connection 23 to the elu-

ent MPak outlet (pierce the connection and turn it through 90°

clockwise).


23 52

55

51 53

Advertising