1 deaerating the pump, Deaerating the pump – Metrohm 761 SD Compact IC User Manual
Page 42
2 Installation
761 SD Compact IC / Instructions for Use 8.
761.1043
34
2.13 Deaerating the pump and rinsing the pulsa-
tion dampener
The high-pressure pump must be deaerated and the isopropanol-filled
pulsation dampener must be rinsed before placing into operation for
the first time.
2.13.1 Deaerating the pump
1 Prepare for deaeration
•
Open the rotary knob on the purge valve 26 by approx. ½ a
turn counter-clockwise.
•
Remove the plastic stopper from the connection 6 on the
front panel of the 761 SD Compact IC (see Figure 1).
•
Push the syringe 6.2816.020 (without needle) fully into the
2 Open and connect the system
•
Launch the «IC Net» PC program if it has not already been
launched.
•
Choose
File / Open / System
in the main window. In the win-
dow which now opens, select file
startup.smt
and click on
<Open>
. You will now see the following system window:
•
Select the
Connect to workplace
item from the
Control
menu in
this window.