1 deaerating the pump, Deaerating the pump – Metrohm 761 SD Compact IC User Manual

Page 42

Advertising
background image

2 Installation

761 SD Compact IC / Instructions for Use 8.

761.1043

34

2.13 Deaerating the pump and rinsing the pulsa-

tion dampener

The high-pressure pump must be deaerated and the isopropanol-filled
pulsation dampener must be rinsed before placing into operation for
the first time.

2.13.1 Deaerating the pump

1 Prepare for deaeration

Open the rotary knob on the purge valve 26 by approx. ½ a

turn counter-clockwise.

Remove the plastic stopper from the connection 6 on the

front panel of the 761 SD Compact IC (see Figure 1).

Push the syringe 6.2816.020 (without needle) fully into the

connection 6.

2 Open and connect the system

Launch the «IC Net» PC program if it has not already been

launched.

Choose

File / Open / System

in the main window. In the win-

dow which now opens, select file

startup.smt

and click on

<Open>

. You will now see the following system window:

Select the

Connect to workplace

item from the

Control

menu in

this window.

Advertising