Arc Machines, Inc. Model 307 Orbital Tube Welder Training

Document No. 740096

Chapter 12. Page 1.

Rev. A

C

hapter 12. Weld Procedure

Optimization

H

eat-to-heat variations in stainless steel may make it necessary to adjust

weld parameters, particularly amperes, for individual heats of material. The

objective of this chapter is to guide the operator to achieve an optimized

weld program from one that is untried. The weld should have complete

uniform penetration around the entire circumference, have good alignment

of weld components and be well purged on the ID and OD. See Chapter 17

Weld Criteria for more specific industry requirements.

Making a Test Run
Before attempting to weld with an untried weld schedule, make a Test Run.

In a Test Run, the weld head rotor rotates at the programmed RPM without

striking an arc.

A Test Run is done to make sure that the Total Time in all levels (excluding

Downslope) is adequate to achieve a complete revolution (360°) plus

tie-in. Downslope must be set to zero for the Test Run and

re-entered for the actual weld.

Total Time includes Time for One Revolution (360°), plus Travel Start

Delay time, plus time for the proper amount of overlap or tie-in which

should be equal to time to travel a distance of at least 2 wall thicknesses.

Weld coupon on 1.500 inch O.D. 316L stainless steel cut open for evaluation

of the I.D. surface for a bioprocess application. Photo courtesy of ProTech Process, Inc.

= t

Total Time

360° +

+ 2Xt