Arc Machines 307 User Manual

Page 95

Advertising
background image

Arc Machines, Inc. Model 307 Orbital Tube Welder Training

Document No. 740096 Chapter 8. Page 7.
Rev. A

Weld Schedule- Weld Levels scrolled down to view Level Time

To Add or Delete a Level.

The default for automatically generated schedules is 4 Levels. If you wish to

add a level, select the level you wish to copy and touch the Level bar to dis-

play the pull-down menu. Select Copy this level to create another level

indentical in all parameters to the level selected. Select Delete Level to

delete the level. You will be prompted with “Do you want to delete level?”

Touch “Yes” to delete the level.

Add Level button. Selecting the Add Level button creates

a new level identical to the last level to the right of the last

level. You must scroll horizontally with the scroll bar to view

the added level.

Note that if changes are made to Level Position the Level Time is automat-

ically adjusted, and vice-versa. However, if a new level is added, you must

enter either time or a new position in the new level in order for the electrode

to advance past the previous last level.

Copy this level

Delete Level

Scroll bar

moved

down to

view or

adjust Level

Times

Advertising