I N S T A L L A T I O N

Routing Cables

Version 5

Model 200i and 250i Motorcycle Dynamometer Installation Guide

2-33

4

Place a split snap bushing around the wheel clamp cable and secure into place in
one hole on the cable pass through cover.

5

Place a split snap bushing around the power carriage cable and secure into place
in the other hole on the cable pass through cover.

6

Secure the cable pass through cover to the dyno with the two screws removed
earlier.

Figure 2-34: Routing Wheel Clamp and Power Carriage Cables

WC012

cable pass through

cover

3-pin power carriage cable

2-pin wheel clamp cable