Unpacking and Inspecting the Dyno

3-2

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

UNPACKING AND INSPECTING THE DYNO

When you receive your dyno, examine the exterior of the shipping container for any
visible damage. If damage is detected at this stage, contact the shipper or Dynojet
before proceeding with unpacking.
Use the following steps to unload your dyno. You will need to provide equipment
capable of lifting a minimum of 2,495 kg (5,500 lb.) to move the crated dyno into
position in your dyno room. Refer to “Dynamometer Specifications and
Requirements” on page 1-4 for
more information.
1

Move the crated dyno (crate 2) to a clear area near your dyno room.

2

Using a pry bar, or a large flat screwdriver, and a hammer, carefully remove the
top and sides of the crate.
Note: At this point, you will want to inspect the exterior of the dyno for any
indications of damage. Report any damage immediately.

3

Remove the following parts from the crate and set aside.
Note: Some of these parts may have been shipped in the stationary dyno crate
(crate 1).

part

description

part

description

bridge cover, stationary

dyno

P/N 21219511

anchor, redhead, 3/8" (12)

P/N 37513200

bridge cover, 4WD dyno

P/N 21219512

installation tool, redhead

anchor

P/N 37518200

rail (2)

P/N 21514282

cylinder mount, dyno

P/N 61300016

rail tie (3)

P/N 21716400

cylinder mount, floor

P/N 61300061

spacer, 424 hydraulic

movement (2)

P/N 26100000

rail tie assembly (2)

P/N 61314300