2 installing the server board, Installing the server board – Kontron TIGH2U Carrier Grade Server User Manual

Page 103

Advertising
background image

Kontron Carrier Grade Server TIGH2U

December 2009

Product Guide, rev.1.2

103

Server Component Replacements—TIGH2U Server

5.7.2

Installing the Server Board

1. Set the replacement board into place (“A”), using caution to make sure no cables are pinched

under the board. Insert the rear edge of the board first, and line up the I/O ports at the rear of

the system.

2. Make sure the standoff locations line up correctly, then insert the six screws that you removed

previously. (“B”)

Figure 81.

Installing the Server Board

l

A

B

TS000441

3. If the replacement board does not have processor(s) / heat sink(s), DIMMs, or optional modules

installed, do the following:
a. Install the processor(s) and heat sink(s). For instructions, see

Section 3.4.5.3, “Installing a

New Processor” on page 48

.

b. Install all DIMMs. For instructions, see

Section 3.4.3, “Installing DIMMs” on page 44

.

c. Install any I/O expansion modules or remote management modules that you might need. For

instructions see

Section 4.3, “Installing an I/O Expansion Module” on page 59

or

Section 4.4,

“Installing Remote Management Module 2 Components” on page 61

.

4. Install the PCI riser assembly. For instructions, see

Section 4.2.5, “Installing the PCI Riser Card

Assembly” on page 59

.

5. Install the PCI fan assembly. For instructions, see

Section 5.2.6, “Installing the Fan Assembly” on

page 82

.

Advertising