TIGH2U Server—Server Component Installations and Upgrades

Kontron Carrier Grade Server TIGH2U

Product Guide, rev.1.2

December 2009

50

5. Close the load plate completely. (

Figure 34

, “A”)

Figure 34.

Closing the Processor Load Plate and Socket Lever

A

C

B

AF000773

6. Close the socket lever and ensure that the load plate tab engages under the socket lever when

fully closed. (“B” and “C”)

3.4.5.4

Installing the Heat Sink

1. If this is a new heat sink (not the one you removed above), remove the protective film, if present,

on the Thermal Interface Material (TIM) located on the bottom of the heat sink.

2. Set the heat sink over the processor, lining up the four captive screws with the four posts

surrounding the processor. Align the heat sink fins to the front and back of the chassis for correct

airflow (front to back). Use caution and make sure that cables are not pinched beneath the heat

sink. (See

Figure 28

.)

3. Loosely screw in the captive screws on the heat sink corners by tightening one, then the one

diagonally opposite, and so on.

4. Gradually and equally tighten each captive screw in diagonal order until each is firmly tightened.

See

Figure 28

for the order.

Caution:

The torque spec for these screws is 8-inch pounds. Be careful not to exceed it.

3.4.6

Other Installation and Upgrade Options

To install the server into a rack, see

“Installing the Server into a Rack”

, below. If you want to install

other optional components, see

Chapter 4, “Optional Component Installations”

.

If you are finished setting up your TIGH2U Server, replace the front bezel, the top cover, and

reconnect the external cables and power cord(s).

3.5

Installing the Server into a Rack

Installation instructions for the standard bracket kit and the optional rail kit are included with each kit.

These instructions can also be found on the server deployment toolkit CD and at

http://us.kontron.com/support/

(Search for TIGH2U, click on Product Downloads, and then Ordering Guide) or on the Kontron

Deployment Assistant CD.

3.5.1

Connecting the Power Cord

Note:

When using a rack, only install the power cord(s) after the server is sucessfully