Kontron TIGH2U Carrier Grade Server User Manual

Page 70

Advertising
background image

TIGH2U Server—Optional Component Installations

Kontron Carrier Grade Server TIGH2U

Product Guide, rev.1.2

December 2009

70

2. Remove the front panel bezel. See

Section 3.2.1, “Removing the Front Bezel” on page 25

.

3. Loosen the shipping screw that fastens the optical drive filler panel to the chassis. (“A”)
4. Detach the retention clip from the filler panel engagement guide behind the SAS backplane board.

Save it for use on the optical drive.

5. Press on the latch on the back of the engagement guide to release the optical device filler panel

from the backplane. (“B”)

6. Remove the filler panel from the chassis. (“C”)

Figure 52.

Removing the Optical Device Filler Panel

B

A

C

C

TS000286

7. Remove the engagement guide from the back of the filler panel. 

Save the guide and the two screws for use on the new optical device.

Advertising