2 installing the front panel board, Installing the front panel board – Kontron TIGH2U Carrier Grade Server User Manual

Page 92

Advertising
background image

TIGH2U Server—Server Component Replacements

Kontron Carrier Grade Server TIGH2U

Product Guide, rev.1.2

December 2009

92

5.4.2

Installing the Front Panel Board

1. Lower the replacement front panel board into the chassis. (

Figure 72

, “A”)

2. While holding the rear edge of the board, push the board forward, sliding the serial port connector

through the matching cutouts in the front panel of the chassis.

3. Lower the rear of the board into position, fitting the board over the placement peg. (“B”)
4. Push the board forward, locking the board onto the placement peg. (“C”)
5. Screw the board into place. (“D”)
6. Screw in the TAM board standoff. (“E”)

Figure 72.

Installing the Front Panel Board

TS000437

D

A

E

C

B

7. (Optional) Install the hardware RAID components, see

Section 4.4, “Installing Remote

Management Module 2 Components” on page 61

components that you removed from the old front

panel board:

8. (Optional) Install the SMART eUSB SSD, see

Section 4.5, “Installing an Embedded USB Solid-

State Drive” on page 62

.

9. Install the TAM board. For instructions, see

Section 5.3.3, “Installing the TAM Board” on page 88

.

10. Install the PCI fan assembly. For instructions, see

Section 5.2.6, “Installing the Fan Assembly” on

page 82

.

11. Install the CPU fan assembly. For instructions, see

Section 5.2.3, “Installing the CPU Fan

Assembly” on page 77

.

12. Connect the power cables.
13. Install the bridge board.
14. Connect the Intel

®

RAID Smart Battery. For instructions, see

Section 4.6.2, “Installing the RAID

Smart Battery” on page 67

.

15. If this is the last task you are performing, replace the front bezel and the chassis top cover.

Reconnect the external devices and plug in the power cord(s).

Advertising