EXFO FTB-8500 Series for FTB-500 User Manual

Page 81

Advertising
background image

Creating and Starting a Test Case

Ethernet and Fibre Channel Application

67

Introducing the Test Setup

Test Setup Controls:

Back returns to the previous configuration step allowing to see,
change or delete what had been selected.

Next switches to the next configuration step. The Next button is
only available when selection(s) from the Data Path Selector
and/or the Grid has been made.

Delete deletes the current path node.

Finish/Setup:

Finish completes the configuration and creates the test case. The
current window settings are only accepted if the selection has
been made from the Grid view. Default parameters will be used
for the remaining wizard steps. Thus, pressing Finish for BERT test
will automatically add a pattern at the end of the test case structure
if not already selected.

Setup is displayed instead of Finish once the test is created
allowing to return in setup mode. Setup is not available when the
test is started (running).

Advertising
This manual is related to the following products: