Chapter 4 equipment list, Module/installation hardware – NEC UNIVERGE NEAX 2000 IPS User Manual

Page 73

Advertising
background image

UNIVERGE

NEAX

2000 IPS

Request For Proposal (RFP) Reference Guide

Page 4-1

Issue 6

Chapter 4 Equipment List

Module/Installation Hardware

This table shows the names and functions of the modules

.

Equipment Name

Function Name

Remarks

SN1729 PIMMJ

PIM

Port Interface Module (PIM)
Maximum 64 physical ports per PIM. Houses two batteries for
protection from short power interruption (for 30 minutes).
At maximum configuration, the system consists of eight PIM’s,
and provides a total of 512 physical ports (64 ports × 8).

SN1730 PIMMK

PIM

Port Interface Module (PIM) for Backup CPU System
Maximum 64 physical ports per PIM.
Houses two batteries for protection from short power
interruption (for 30 minutes).
One PIM is required per Backup CPU System.

COVER PARTS
ASSEM-A

COVER PARTS

ASSEM

Cover Parts Assembly
One cover parts assembly is required for each PIM.

SN1545
BASE

BASE/TOP

ASSEM

Base/Top Cover Assembly
One base and top cover assembly is required for each stack.

SN1731
BATTMH

BATTM

Battery Module for housing PIM or CS (ZT) backup batteries
Houses two pairs of batteries for protection from long power
interruption (for 3 hours).


Advertising