NEC UNIVERGE NEAX 2000 IPS User Manual

Page 74

Advertising
background image

Chapter 4 Equipment List

Page 4- 2

NEAX2000 IPS

Request For Proposal (RFP) Reference Guide

Issue 6

This table shows the name and functions of installation hardware.

Equipment Name

Remarks

HANGER ASSEM (B)

Wall Hanger Assembly
One HANGER ASSEM is required per PIM for Wall Mounting
Installation.

MOUNTING BRACKET

Safety Mounting Bracket
Used as an overhead hanger for Floor Standing Installation. Wire,
chain or eyebolts are to be locally provided, to secure the bracket.
To be installed on the top PIM in four or more modules of stack. It
provides 1.1G shockproof construction.

19” RACK BRACKET (A)

19-inch Rack Mounting Bracket Type A
One bracket is required for one PIM configuration.
One bracket is required for the top PIM of multiple module
configurations.

19” RACK BRACKET (B)

19-inch Rack Mounting Bracket Type B
One bracket is required for the bottom module of multiple module
configurations

.

I/F BRACKET ASSEM

Inter Frame Bracket Assembly
Used to join the frames in two-stack configuration, for Floor
Standing Installation.

BASE TRAY ASSEM

Base Tray Assembly
One BASE TRAY is required per one frame for Floor Standing
Installation of Stationary Equipment.

Advertising