Chapter 2 wiring, Ia net, Xsel-r/s – IAI America XSEL-S User Manual

Page 31

Advertising
background image

Chapter 2 Wiring

25

IA Net

XSEL-R/S

Chapter 2 Wiring

The wiring between each of XSEL controllers and extension I/O units should be accomplished

exclusively with dedicated IAI original equipment cables.

Connect terminal resistors on both ends of the network.

The maximum number of connectable units (total of XSEL controllers and extension I/O units)

differs depending on the construction. Establish the network construction in advance and check

the number of connectable units. Refer to Section 3. Operation for details.

Note 1 * * * : Cable length

Caution
Simultaneous power application to XSEL controllers connected to the IA Net is recommended.

When booting an IA Net connected XSEL controller, the system waits for the link of all the

stations set in I/O Parameters No.605 and 606. In case the link of all the stations is not

confirmed, “211/552: IA Net Link Error” will be issued.
Link Establish Waiting Time can be adjusted in Bit 24 to 31: IA Net Initializing Link Waiting

Timeout (sec) in I/O Parameter No. 608 “IA Net Attribute 1” (Initial setting = 15sec). Adjust the

time if necessary.

Dedicated

cable

for IA Net

(CB-RS-IAN

* * *

(Note 1)

)

FMC1.5/3-ST-3.5

(PHOENIX

CONTACT)

FMC1.5/3-ST-3.5

(PHOENIX

CONTACT)

IA Net

Connector 1

IA Net

Connector 2

XSEL Controller 1st Unit

1(SA)
2(SB)
3(SLD)

1(SA)
2(SB)
3(SLD)

IA Net

Connector 1

IA Net

Connector 2

XSEL Controller 2nd Unit

1(SA)
2(SB)
3(SLD)

1(SA)
2(SB)
3(SLD)

IA Net

Connector 1

IA Net

Connector 2

Extension I/O Unit

1(SA)
2(SB)
3(SLD)

1(SA)
2(SB)
3(SLD)

Terminal

Resistance

R=100:1/2W

Terminal

Resistance

R=100:1/2W

XSEL Controller 1st Unit

XSEL Controller 2nd Unit

Extension

I/O Unit

Terminal

Resistance

Terminal

Resistance

CB-RS-IAN * * *

(Note 1)

Dedicated

cable

for IA Net

(CB-RS-IAN

* * *

(Note 1)

)

Advertising
This manual is related to the following products: