There can be up to 255 events linked together into a sequence. Only one sequence can
be created.
When two or more events have been moved into a Sequence cell, they can be linked into
a sequence by assigning the action Advance the sequence to events in the chain. The
last event in a sequence is then usually assigned the action Trigger.
There are two ways to assign an action to an event button:
•
Right-click on an event button and select Specify Action from the pop-up
menu.
•
Double-click on the event button and then select an action from the
Properties dialog box.
Assigning an Action from the Pop-up Menu
To assign an action to an event button via the pop-up menu,
Step 1 Right-click on the button. A pop-up menu appears:
Step 2 Select Specify Action and then an action from the sub-menu. The
menu closes and the action is assigned.