Making a cut or mark – Lincoln Electric 718115 Spirit II 275 User Manual

Page 53

Advertising
background image

Spirit II User’s Manual

Section 4: Operation with Automatic Gas Console

This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to

non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.

4-7

Making a Cut or Mark

Once the material type, material thickness, and process have been selected; the correct

torch parts (consumables) installed; and the X/Y controller and torch height control are

properly configured; the system is ready to cut or mark.

1. Release the OFF Button (turn to the right) and then press the ON Button on the

Plasma Console.

2. The AGC will purge the gas hoses and set the correct gas pressures automatically.

After the pressures have been set, the Gas Console indicator on the Status Screen

will change from red to green.

3. Once the Gas Console indicator is green, the system is ready for cutting or marking.

4. When the system receives a start signal from the X/Y controller, the following

sequence is initiated:

Two second gas preflow

Impulse start circuit energized

Pilot arc initiation

Transferred arc (cutting or marking arc) established

Motion output relay energized

When the start signal is removed, the arc is extinguished and the motion output relay

is deenergized.

Check the troubleshooting section if any indicators in this procedure fail to change from

red to green after 10 seconds.

Note: The DC Power indicator will only turn green while cutting.

Advertising