Collect check point prompt, Collect check point screen – Spectra Precision Survey Pro v4.6 Ranger User Manual User Manual

Page 329

Advertising
background image

Basic GPS Module

319

Collect Check Point Prompt

1. Select an existing job file point.
2. Designate if it is valid for horizontal,

vertical, or 3D control.

3. Level the receiver over the point and

tap Start Control Point Occupation. This
will open the Collect Check Point

screen, below, to monitor the

occupation.


Collect Check Point Screen

1. Examine the errors. Only the errors for

the dimensions you specify for this

control point (2D/1D/3D) will be shown.

2. Tap Accept to finish the occupation.

The control point is created in the job

file and the raw data is recorded. This
screen and the previous screen will exit,

and you will be at one of two places:

a. If you do not have one extra H

or V point for the localization

check, you will be back at the

Check Points Status screen

(Page 318).

b. If you have the required H and V points for the check,

the wizard will advance to the Solve Localization and

Detect Blunders screen, below.

Advertising