SRD960 with FOUNDATION Fieldbus:

Menu 10: FF Configuration

M

1

2

3

4

½

-

-

½ ½

M, LED 3 and LED 4 flash

Special settings for Foundation Fieldbus device.

10.1 Simulate enable / disable

¼ ¾

-

-

-

M short flash, LED 1 long flash

The SRD960 sends during normal operation its actual Position-Actual-
Value

1)

back to the control system.

If, however, “Simulate” is released in the SRD and in addition via communi-
cation Simulate is activated, then a simulation value coming from the control
system is sent back as an actual value to the control system. In this way
within the control system, e.g. the reaction to specific valve adjustments can
be tested without having to adjust the valve – the SRD regulates toward the
”accurate” setpoint value.
For further information about the Simulate see TI EVE0105 Q.

10.1.1 Simulate Disabled

-

1

-

-

-

LED 1 lights up

Disable simulate. The real valve position will be indicated.

10.1.2 Simulate Enabled

-

-

-

-

1

LED 4 lights up

Release simulate.

10.2 Foundation Fieldbus Profile: Activate Link Master

¼

-

¾

-

-

M short flash, LED 2 long flash

10.2.1 Link Master active

-

1

-

-

-

LED 1 lights up

This SRD becomes the Link Master if Control System is down.

10.2.2 Basic device

-

-

-

-

1

LED 4 lights up

This SRD becomes not the Link Master if Control System is down.

By using the UP or DOWN keys the desired condition can be selected and
entered through pressing keys UP+DOWN.

1)

With the option ”Position Feedback”, the position-actual-value will be displayed, as before,
as analog value 4 to 20 mA.

SRD Main Menu

8 Setpoint

9 Workbench

10 FF Config

10 FF Config

10.1 Simulate

10.2 Profile

10.1 Simulate

10.1.1 Disabled

10.1.2 Enabled

10 FF Config

10.1 Simulate

10.2 Profile

10.2 Profil

10.2.1 Link Mast

10.1.2 Basic Dev

Page 53

Startup

August 2014

POS-UM-00009-EN-02

Advertising