Multi-target configurations), Primary sites (in 3dc multi-target configurations) – HP XP Continuous Access Software User Manual

Page 87

Advertising
background image

Figure 35 Transferring business tasks from CA XP second. sites to prim. sites (in

3DC cascading configs.)

Transfer. business tasks from CA XP sec. sites to prim. sites (in 3DC multi-target configs.)

If you remove failures from the primary site and other locations after the system changes to a 3DC

multi-target configuration (see

Recovering from primary site failures

and

Changing to 3DC multi-target

configurations after recovering from primary site failures

), you can transfer your business tasks back to

the primary site.
To transfer your business tasks back to the primary site:

1.

Use RAID Manager XP to delete the current Continuous Access XP Journal pair, which extends

between the Continuous Access XP secondary site and Continuous Access XP Journal secondary site

(DC2 to DC3).

2.

Stop your business tasks at the Continuous Access XP Synchronous secondary site.

3.

Use RAID Manager XP to execute the horctakeover command on the Continuous Access XP

Synchronous pair.

4.

Use the primary volume at the primary site (DC1) to resume your business tasks.

5.

Use RAID Manager XP to create a Continuous Access XP Journal pair from DC1 to DC3. Ensure

that the Continuous Access XP Journal primary data volume is a volume at the primary site, and

the Continuous Access XP Journal secondary data volume is a volume at the Continuous Access XP

Journal secondary site. The system configuration returns to the original 3DC multi-target configuration.

Continuous Access XP Journal user guide

87

Advertising
This manual is related to the following products: