HP XP Continuous Access Software User Manual

Page 90

Advertising
background image

No.

If the Status of the

Pair in the Primary

Site is

and the Status of

the Pair in the UR

Secondary Site is

Perform the Following

Operation before

Transferring Business

Tasks Back to the

Primary Site

3

PSUE or PSUS

HOLD

1.

Remove the

Continuous

Access XP

Journal pair

from the

primary site.

2.

Make sure

that all

the pairs

belonging to

the journal

group in the

primary site

are removed.

3.

Create a

Continuous

Access XP

Journal delta

resync pair

that extends

from the

primary

site to the

Continuous

Access XP

Journal

secondary

site. For

information

about

requirements

for creating

the pair, see

Requirements

for creating

Continuous

Access XP

Journal

pairs for

delta resync

operations

.

90

Continuous Access XP Journal operations requirements and restrictions

Advertising
This manual is related to the following products: