Foundation requirements, Baseplate-mounting procedures, Prepare the baseplate for mounting – Goulds Pumps IC - IOM User Manual

Page 17: Oundation requirements, Pare the baseplate for mounting

Advertising
background image

Foundation requirements

Requirements

• The foundation must be able to absorb any type of vibration and form a permanent, rigid support for

the pump unit.

• The location and size of the foundation bolt holes must match those shown on the assembly drawing

provided with the pump data package.

• The foundation must weigh between two and three times the weight of the pump.
• Provide a flat, substantial concrete foundation in order to prevent strain and distortion when you

tighten the foundation bolts.

• Sleeve-type and J-type foundation bolts are most commonly used. Both designs allow movement for

the final bolt adjustment.

• The concrete foundation must have sufficient firmness according to DIN 1045 or equal standard.

Sleeve-type bolts

1

2

3

4

5

6

1.

Baseplate

2.

Shims or wedges

3.

Foundation

4.

Sleeve

5.

Dam

6.

Bolt

J-type bolts

1

3

2

4

5

1.

Baseplate

2.

Shims or wedges

3.

Foundation

4.

Dam

5.

Bolt

Baseplate-mounting procedures

Prepare the baseplate for mounting

1. Remove all the attached equipment from the baseplate.
2. Clean the underside of the baseplate completely.
3. If applicable, coat the underside of the baseplate with an epoxy primer.

Use an epoxy primer only if you used an epoxy-based grout.

4. Remove the rust-proofing coat from the machined mounting pads using an appropriate solvent.
5. Remove water and debris from the foundation-bolt holes.

Installation

Model IC, ICI, ICH, ICIH Installation, Operation, and Maintenance Manual

15

Advertising