Auxiliary-piping checklist

Precautions

WARNING:

• Cooling systems such as those for bearing lubrication and mechanical-seal systems must be operating

properly to prevent excess heat generation, sparks, and premature failure.

• Sealing systems that are not self-purging or self-venting, such as plan 23, require manual venting prior

to operation. Failure to do so will result in excess heat generation and seal failure.

NOTICE:
The mechanical seal must have an appropriate seal-flush system. Otherwise, excess heat generation and
seal failure can occur.

When to install

You may need to install auxiliary piping for bearing cooling, seal-chamber cover cooling, mechanical seal
flush, or other special features supplied with the pump. Consult the pump data sheet for specific auxiliary
piping recommendations.

Checklist

Check

Explanation/

comment

Checked

Check that the minimum flow for each component is 1 gpm (4 lpm).
If the bearing and seal chamber cover cooling are provided, then the

auxiliary piping must flow at 2 gpm (8 lpm).

Check that the cooling water pressure does not exceed 100 psig (7.0 kg/

cm

2

).

Final piping checklist

Check

Explanation/comment

Checked

Check that the shaft rotates smoothly.

Rotate the shaft by hand. Make sure there is no

rubbing that can lead to excess heat generation or

sparks.

Re-check the alignment to make sure that

pipe strain has not caused any

misalignment.

If pipe strain exists, then correct the piping.