Shaft sealing, Seal the shaft with a packed stuffing box – Goulds Pumps IC - IOM User Manual

Page 73

Advertising
background image

j) Remove the stud that was used to align frame adapter and frame. Bolt the bearing frame (330) to

the frame adapter (334) with the hexagon head bolts (901.41).
Make sure to position the bolts in the center of the drilled holes in order to ensure the proper oil
settings. Tighten according to the Bolt torque values table.

3. Push the flinger (507) onto the shaft (210) until it rests axially against the shoulder of the shaft.

Maintain a clearance of at least 0.028 in. (0.7 mm) between the flinger and the frame adapter (344).
If necessary, use a driver in order to install the flinger. Do not use excessive force.

210

507

344

Driver

Shaft sealing

WARNING:
The mechanical seal used in an Ex-classified environment must be properly certified. Prior to startup,
make sure that all areas that could leak pumped fluid to the work environment are closed.

NOTICE:
The mechanical seal must have an appropriate seal-flush system. Otherwise, excess heat generation and
seal failure can occur.

Seal the shaft with a packed stuffing box

WARNING:
Packed stuffing boxes are not allowed in an ATEX-classified environment.

Pumps are shipped without the packing, lantern ring, or split gland installed. These parts are included with
the box of fittings shipped with each pump and must be installed before startup.
1. Carefully clean the stuffing-box bore.
2. Twist the packing enough to get it around the shaft.

Maintenance

Model IC, ICI, ICH, ICIH Installation, Operation, and Maintenance Manual

71

Advertising