Kinze Grain Carts Rev. 7/14 User Manual

Page 3

Advertising
background image

®

Grain Cart

M0238-01

5/12

1

Predelivery/Delivery Checklist

900-1100-1300-1500 Grain Cart

PREDELIVERY/DELIVERY CHECKLIST

TO THE DEALER

Predelivery service includes assembly, lubrication, adjustment and test. This service ensures cart is delivered to retail
customer/end user ready for field use.

PREDELIVERY CHECKLIST

Use this checklist to inspect cart after it is completely assembled. Check off each item as it is found satisfactory or after
proper adjustment is made.

Wheel nuts torqued to 350 ft-lb (474 N-m).

Tires inflated to specified air pressure. (If Applicable)

All grease fittings lubricated and gearbox oil level checked.

All safety decals and SMV sign are correctly located and legible. Replace if damaged.

SMV decal is in place and shipping cover removed.

Safety/warning lights working properly.

Test run augers. Do not operate tractor PTO above 750 PTO RPM with augers empty.

Check driveline. See “Driveline Inspection” in Operation section.

V-belts aligned and properly tensioned.

Check track alignment. See “Track Alignment” in Maintenance section. (If Applicable)

Safety screens over horizontal auger are in place and properly secured.

Auxiliary safety chains are properly installed and hardware torqued to specification.

Paint all parts scratched in shipment.

This wagon has been thoroughly checked and to the best of my knowledge is ready for delivery to the customer.

(Signature Of Set-Up Person/Dealer Name/Date)

OWNER REGISTER

Name

Delivery Date

Street Address

Model No.

Serial No.

City, State/Province

Dealer Name

ZIP/Postal Code

Dealer No.

Advertising