5installation – Lenze E94AYCPM User Manual

Page 24

Advertising
background image

5

Installation

5.2

Electrical installation

24

Lenze · E94AYCPM communication module (PROFIBUS®) · Communication Manual · DMS 12.0 EN · 11/2012 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

If the communication module is supplied externally, the bus terminator can be supplied

independently of the standard device supply.



External voltage supply

( 28)



Activating the bus terminating resistor

( 25)

Number of stations

[5-5]

Number of stations

Tip!
Repeaters do not have a station address. When calculating the maximum number of

stations, they reduce the number of stations by 1 on each side of the segment.
Repeaters can be used to build up line and tree topologies. The maximum total bus system

expansion depends on ...

• the baud rate used;
• the number of repeaters used.

Note!

The bus terminator must always be supplied. Otherwise, the bus can get unstable.

2133PFB004

M

1

2

3

S

S

S

S

S

R

R

Segment

Master (M)

Slave (S)

Repeater (R)

1

1

31

-

2

30

-

2

-

30

1

3

-

30

1

Advertising