Lenze · E94AYCPM communication module (PROFIBUS®) · Communication Manual · DMS 12.0 EN · 11/2012 · TD17

39

6

Commissioning

6.5

Going online with »Engineer« via TCI

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

12. After the assignment, the connection appears in the "Assigned" display area. Complete the

dialog with OK.

13. In the »STEP7« project, the PG/PC station is marked with a yellow arrow. (The connection

selected is active.)