6commissioning – Lenze E94AYCPM User Manual
Page 39
Advertising
![background image](/manuals/565754/39/background.png)
Lenze · E94AYCPM communication module (PROFIBUS®) · Communication Manual · DMS 12.0 EN · 11/2012 · TD17
39
6
Commissioning
6.5
Going online with »Engineer« via TCI
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
12. After the assignment, the connection appears in the "Assigned" display area. Complete the
dialog with OK.
13. In the »STEP7« project, the PG/PC station is marked with a yellow arrow. (The connection
selected is active.)