6commissioning – Lenze E94AYCPM User Manual

Page 40

Advertising
background image

6

Commissioning

6.5

Going online with »Engineer« via TCI

40

Lenze · E94AYCPM communication module (PROFIBUS®) · Communication Manual · DMS 12.0 EN · 11/2012 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

14. Start the transfer of the TCI communication parameters in the »HW Config« using the right

mouse button and the menu command Start device tool L-force Engineer.

15. If the »Engineer« has already been started with the applicable project, the following

message will appear:

• The message says that the »Engineer« project is not set to a TCI communication path and

provides information on whether this action is to be executed now.

• If you confirm the message with Yes, the applicable TCI communication parameter

settings of the »STEP7« project are transferred to the »Engineer«.

Advertising