65

Drive Electrical Interconnection

Chapter 4

Connect Ground Bus

Introduction

A solid ground bus is located at the bottom front of each cabinet. When a
shipping split is required, two braided ground bus connectors are supplied. One
is attached above the solid ground bus and one below (

Figure 49

).

Ground bus connection openings are provided in the cabinet sidesheets for this
connection. See

Table 5 on page 28

and

Table 6 on page 29

.

Figure 49 - Interconnection Ground

Complete the Installation

1.

Inspect the interior of all cabinets carefully for hardware or tools that may
have been misplaced.

2.

Check and verify that no hardware or foreign material has fallen in the
secondary windings in the Isolation Transformer cabinet.

3.

Check that all mechanical work has been completed properly. All barriers
and guards that may have been removed must be reinstalled.

4.

Check that all electrical connections have been made and torqued as
specified.

5.

Verify the safety circuit is working properly (see

page 53

).

6.

Reinstall all of the cabinet back plates.