Rockwell Automation GV3000/SE, VTAC 7 Super Remote Meter Interface Board M/N 2SI3000 M/N 2SI3000E User Manual
Page 39
Advertising
Installation
3-25
Step 5.4 NEMA 4X/12 drives only: Before installing the cover, check that the gaskets
on the cover are flat and within the gasket channels.
Step 5.5 Reinstall the cover. Align all cover screws into the heat sink before
tightening any of them.
To maintain the integrity of NEMA 4X/12 drives, sequentially tighten the
cover screws to ensure even compression of the gaskets. Do not exceed
2.2 Nm (20 in-lb) of torque on these screws.
Step 5.6 Remove the lockout and tag. Apply power to the drive. SELF will be
displayed while the drive performs power-up diagnostics.
This completes the hardware installation of the RMI board. Refer to chapter 4 for the
required software parameter settings for your drive.
Advertising