Rack Mount Configuration

Recommended Tools

Before you begin the installation tasks, ensure that you have the following

items:

• #1 Phillips screwdriver
• #2 Phillips screwdriver
• Wrist grounding strap connected to ground
• Antistatic mat or antistatic foam

Installation Tasks

To install the rail and system into the rack, you need to perform the following

tasks.

1 "Installing the Tool-Less Rail Solution in the Rack" on page 223
2 "Removing Sled Modules from the Server Enclosure" on page 228
3 "Installing the Server Enclosure into the Rack" on page 228
4 "Replacing Sled Modules in the Server Enclosure" on page 230
5 "Installing the External PDU into the Rack" on page 231
6 "Connecting the Power Cables" on page 237
7 "Connecting the Server Enclosure to a Rack PDU" on page 239
8 "Connecting the PDU to the Network" on page 243
9 "Powering Up the Systems" on page 246