6, operation, Don’t, System check – Toshiba LF434 User Manual

Page 33: Placing system on-stream, Supplying electric power, Checking converter parameters, Zero adjustment, On-line measurement, Caution, Toshiba

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

TOSHIBA

6 F 8 A 0 7 7 0

6, Operation

A

CAUTION

n Do not touch the LF434/LF404 maio body when

high temperature fluid h being measured«

The fluid raises the main

body leinperaturc and can

cause burns when touched.

0

DON’T

6,1 Preparatory check

hollow the proceclurc described bdo^v to prepare before starling the flow measuremem.

System Check

Check the wiring bciween the converter and related instruments,

Make sure all the boils of connection flanges on which the flowmeter is mounted

securely tightened.

Make sure the direction of flow arrow is in accordance with actual flow.

Make sure the flowmeter is grounded with ICO ohm or less ground resisiance.

Make sure the converter housing covers arc securely tightened.

Placing System On-Stream

Let the fluid go through the detector pipe. When the detector is filled with the

fluid, stop the fluid and keep

i t s t i l l ¡ n

the detector pipe.

Supplying Electric Power

Make sure the power supply is as specified.

Checking Converter Parameters

Check the configurntion paramcicr settings. Refer to Chapter 7, "‘LCD Display

and Controls,” Chapter 8, ‘"Configuration Parameter Setting,and Chapter 11,

“Commiinications Eunclioii,”

Zero Adjustment

Wail for 30 minutes to warm up the flov-mieter. Then making sure the fluid holds
still in the detector pipe, starts the zero adjustment.

Refer 10

6 2 ,

“Zero Adjustment.”

On-line measurement

Alter checking the items and conducting the zero adjustment as listed above, let the fluid go

through the detector pipe. Output (4-20 iriA dc) directly proportional to the flow' rate can be

obtained.

-

3 2

-

Advertising