Toshiba – Toshiba LF434 User Manual

Page 70

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

TOSHIBA

6 F 8 A 0 7 7 0

8.2.B Zero Adjustment

To cond^ict Ihe zero adjustment of :he flowmeter, ihe fluid in the detector pipe must be

held stilL (if the fluid cannot be stilled by any means, sec 8,2.16, ‘‘Zero Offset

Adjustment/")

To

Stan

the zero adjustment, follow the procedure described below.

The zero adjustment for models wiihoui l.CD display can he conducted with the switch in

the converter. See 6.2, “Zero Adjustmcni" for details.

Key operation

Display example

Description

SET

El: ZERO DJUST

OE 0

%

Press [SET] first to start the items selection

¡sequence and select El: ZEROADJUifr from among
the configuration items using [ ► ] and [

a

j keys.

Then press [SEl ] again to display the current flow

rale (1,0% in this example).

ADJUST READY

ai.

1

%

Pressing [ ► ], “AllJUSl'READY” appears ajj shown

:cfl and the system is ready for zero adjustment.

(Note 1)

SE'l

4 ZERO ADJUST

Pressing [SET], ZERO ADJUST’’ appears as

shown left and the system starts the zero adjustment.

The zero adjustment takes about 3 to 6 seconds,

(Note 2)

El: ZERO ADJUST

Newly

adjusted zero

point

Eippears.

00. 0

%

SET

El: ZERO ADJUST

Pressing [SET], the system returns to the items

selection sequence*

Notes

1

.

2

.

To cancel the zero adjustment, press [

a

]. The system returns to the point

w^here zero point is displavüd.

Zero adjustment duration depends on the excitation frequency

(24 I

I z :

3 sec, 12 Hz and 6 Hz: 6 sec).

-

69

-

Advertising