Operation • 2, Run a trial piece, Start machine operation – Pitney Bowes DI380 OfficeRight Systems User Manual
Page 19
Operation • 2
2-3
SV61789 Rev. A
Run a Trial Piece
Once material is in place, press
Trial Piece so that you can check
the setup is correct.
You can make minor changes to the job settings at this stage if the
trial piece needs fine tuning. Enter setup as described on page
2-11, then use the
Prev (◄), Next (►) and Change (+/-) buttons as
required to modify job settings. When you’ve made the necessary
changes, press
Setup again to return to run mode. Your inserter sys-
tem will save the job with the new settings.
Notes:
1. When you use linked feeding, load
both sheet feeders before
you run a trial piece.
2. If you load material during a run which seems to have differ-
ent characteristics (weight, color shade, etc.), or if you have any
problems with double detection, run another trial piece. This
causes the machine to recalibrate the double detect function for
the new material which may vary slightly from the old.
Start Machine Operation
Press
Start to begin automatic operation.
The machine operates until material runs out or you press the
Stop
button.
Note: If the machine is set for linked feeding, the display shows:
1 > 2 > 1
This confirms that feeding will automatically switch between
sheet feeders. See page 2-15 for more information.