Operation • 2, Testing the job – Pitney Bowes DI380 OfficeRight Systems User Manual

Page 39

Advertising
background image

Operation • 2

2-23

SV61789 Rev. A

Testing the Job

Load material and press

Trial Piece so that you can check if the set-

up is correct.
You can make minor changes to the job settings at this stage if the

trial piece needs fine tuning. Press

Setup, then use the Prev (◄),

Next (►) and Change (+/-) buttons as required to modify job set-

tings. The chart below may help you fine tune your fold settings.

FOLD TYPE

ADDRESS TOO LOW

ADDRESS TOO HIGH

C — Letter Fold

Decrease Fold A

Increase Fold A and

increase Fold B by

the same amount

Z — Accordion

Increase Fold A

Decrease Fold A a

Fold

increase Fold B by

the same amount

Single Fold

Increase Fold A

Decrease Fold A

Double Fold

Decrease Fold A

Increase Fold A

We suggest you change the fold by 0.20 inches (5mm) each time

and run a new trial piece run to test the settings.
When you’ve made the necessary changes, press

Setup again to re-

turn to run mode. Your inserter system will save the job with the new

settings.

Advertising