Connections required between the sbs, Standard function blocks – Pilz PSS SB FT, Basic license User Manual

Page 156

Advertising
background image

6-112

Modular Block System: Burner Management

Standard Function Blocks

Connections required between the SBs

Block

Connection required

Reason/application

SB149

NEXT (SB149)

→

Correct function cycle

RDY (of following SB149)
STEP (SB152)

→

Burner start detection and

STEP (SB149, SB157)

resetting sequence

SB150

RUN (SB158)

→

For pilot flame

RUN (SB150)

monitoring

FLAI (SB158)

→

For pilot flame

MONI (SB150)

monitoring

RUN (SB159)

→

For main flame

RUN (SB150)

monitoring

FLAM (SB159)

→

For main flame

MONI (SB150)

monitoring

Perform

AND-operation

For flame fault

ENBL from all SB150

→

evaluation

FLAs (SB152, SB157)

SB151

ENBL (SB151)

→

Fault leads to a controlled

AND-operation before

shutdown (when

AuSt = 1

ERR (SB152)

with restart)

or
ENBL (SB151)

→

Fault leads to a safety

AND-operation before

shutdown

CHAI (SB152)

SB152

ENBL (SB152)

→

Valve seal when a

SyOK (SB156, SB157,

shutdown occurs;

SB158, SB159)

ignition

RUN (SB159)

→

Signals the operating status

RUN (SB152)

of the main flame
to SB152

ENBL all SB150

Flame fault

AND-connected

→

evaluation

FLAs (SB152)
STEP (SB152)

→

Burner start detection and

STEP (SB149, SB157)

resetting sequence

Advertising
This manual is related to the following products: