Connections required between the sbs, Standard function blocks – Pilz PSS SB FT, Basic license User Manual

Page 156

Advertising
background image

6-112

Modular Block System: Burner Management

Standard Function Blocks

Connections required between the SBs

Block

Connection required

Reason/application

SB149

NEXT (SB149)

Correct function cycle

RDY (of following SB149)
STEP (SB152)

Burner start detection and

STEP (SB149, SB157)

resetting sequence

SB150

RUN (SB158)

For pilot flame

RUN (SB150)

monitoring

FLAI (SB158)

For pilot flame

MONI (SB150)

monitoring

RUN (SB159)

For main flame

RUN (SB150)

monitoring

FLAM (SB159)

For main flame

MONI (SB150)

monitoring

Perform

AND-operation

For flame fault

ENBL from all SB150

evaluation

FLAs (SB152, SB157)

SB151

ENBL (SB151)

Fault leads to a controlled

AND-operation before

shutdown (when

AuSt = 1

ERR (SB152)

with restart)

or
ENBL (SB151)

Fault leads to a safety

AND-operation before

shutdown

CHAI (SB152)

SB152

ENBL (SB152)

Valve seal when a

SyOK (SB156, SB157,

shutdown occurs;

SB158, SB159)

ignition

RUN (SB159)

Signals the operating status

RUN (SB152)

of the main flame
to SB152

ENBL all SB150

Flame fault

AND-connected

evaluation

FLAs (SB152)
STEP (SB152)

Burner start detection and

STEP (SB149, SB157)

resetting sequence

Advertising
This manual is related to the following products: