Commissioning, Technical requirements, Start-up behaviour – Flowserve SPECTORcontrol User Manual

Page 11: Shutdown behaviour, Factory settings

Advertising
background image

11

Commissioning

Technical requirements

All components to be monitored must be connected and operating.

The visual display & operating panel must be provided with a CompactFlash

card and

the power supply must be switched on.

Start-up behaviour

To commission the display & operating panel switch on the power supply. First a system
test is carried out. Then the hardware is checked.

After that the user program is automatically loaded from the CompactFlash

and the start

menu is displayed (duration: approx. 4 min.).

Shutdow n behaviour

A short power supply failure of up to 10ms will be buffered by the power supply unit. In
the event of a longer power failure you have to reset SPECTOR

control

in order to restore

the power supply.

Factory settings

The graphical screen masks are configured by GESTRA. All adjustable masks are
completely available, no matter whether the indicated instruments are part of the bus
system or not. Subsequent expansion or modification is therefore possible at any time.

The scope of the adjusted values and hence the degree of preadjustments depends
whether a pre-configured OEM version is used or whether SPECTOR

control

will be

connected to an existing bus system and therefore the configuration of the system must
be completely new.

If a pre-configured OEM version is used, the individual components with the adjusted
parameters are stored on the CompactFlash

card.

Note

Any fault occuring during start-up will be indicated.

Advertising