Position controller setup, Controller menu – Flowserve SPECTORcontrol User Manual

Page 48

Advertising
background image

48

Controller Menu

– continued –

2-position controller setup

1.

Press button

2-pos. controller

in the menu

Controller Setup

.

2.

The name of the controller is highlighted in
yellow.

3.

The green input field

Actual value

shows

the actual value. Click in the input field to
show all established signals.

4.

Select the signal that indicates the re-
quired parameters. For more information
on the setup and configuration of the
equipment see menu CAN Input and Ana-
log Input.

5.

To toggle between fill and discharge con-
trol press button fill or discharge control. The selected control mode is indicated in
the right hand field.

6.

The bottom field specifies the actuator. This field is highlighted in yellow if pump and/
or valve control has been adjusted.

7.

To set the valve control press button

Valve control

.

8.

To set the pump control press button

Pump control

.

9.

To parameterise the controller press button

.

2-pos. controller

Setup

Logo

NC

Fill control

parameterised

Valve control

Actual value

Controller 1

Discharge control

Pump control

Parameterised as

Advertising