Fronius Agilo 75.0 User Manual

Page 41

Advertising
background image

39

EN

3

-

Feed the AC cable into the inverter, ob-
serving the bending radii specified by
the cable manufacturer

-

Strip sheath from AC cable

-

Strip at least 20 mm of wire from phase
conductor L1 - L3, neutral conductor N
and ground conductor PE

-

Align phase conductors L1 - L3 and
neutral conductor N with the mains
connections according to the phase

-

Align the ground conductor PE with the
grounding terminal

-

Push the AC terminal over the phase
conductor, the neutral conductor and
the ground conductor

4

-

Push the AC terminal up and over the
mains connection and the bare end of
the cable

-

Tighten the AC terminal:
5 mm Allen key

Tightening torque = 12 Nm

-

Place the insulation caps onto the
mains connections

-

Repeat the process for phase conduc-
tors L2 and L3 and the neutral conduc-
tor N

5

-

Close the connection covers for the
mains connections

3

3

1

3

2

1

4x

L1

L2

L3

N

4

5

Advertising
This manual is related to the following products: