MicroE Mercury II 6000 User Manual

Page 57

Advertising
background image

PurePrecision Laser Tape II Scale Installation

IM-Mercury_II_PurePrecision_Scales Rev. 1

Page 13

©2014 MicroE Systems

Mercury II PurePrecision Tape and Glass Scales
Installation Manual and Reference Guide

Step

Action

7.

Peel off the blue protective film:
Start the peeling process using a sharp tool, being careful not to damage the scale. Pull off
the remaining blue

protective film.


8.

After removing the blue protective film, the scale is ready for use and will perform to
specification. The encoder will not function properly with the blue protective film installed. It
must be removed for proper encoder operation.

If installing Laser Tape II index/limits, go to

Section 5.0 Stick-On Index and Limit Markers

Installation.

Pull off remaining blue film

Advertising