Figure i.6 – Yaskawa U1000 Industrial MATRIX Drive User Manual

Page 17

Advertising
background image

A

C

A

B

B

D

E

Side Clearance

Top/Bottom Clearance

A – 50 mm (1.97 in) minimum
B – 30 mm (1.18 in) minimum
C – 200 mm (7.87 in) minimum

D – 120 mm (4.72 in) minimum
E – Airflow direction

Figure i.6 Correct Installation Spacing

Note:

IP20/NEMA Type 1 enclosure and IP00/Open Type enclosure models require the same amount of space above and below the drive for

installation.

u

Instructions on Installation Using the Eye Bolts and Hanging Brackets

Eye bolts and hanging brackets are used to install the drive or to temporarily lift the drive during drive replacement. Using the

eye bolts and hanging brackets, the drive can be installed in an enclosure panel or on a wall. Do not leave the drive suspended

by the wires in a horizontal or vertical position for long periods of time. Do not transport the drive over long distances. Read

the following precautions and instructions before installing the drive.

WARNING! Crush Hazard. Observe the following instructions and precautions. Failure to comply could result in serious injury or death from

falling equipment.

Only use vertical suspension to temporarily lift the drive during installation to an enclosure panel. Do not use vertical suspension to transport

the drive.

Confirm that the spring washer is completely closed prior to lifting to prevent damage to the drive.

Use screws to securely affix the drive front cover, terminal blocks, and other drive components prior to vertical suspension.

Do not subject the drive to vibration or impact greater than 1.96 m/s

2

(0.2 G) while it is suspended by the wires.

Do not leave the drive unattended while it is suspended by the wires.

Do not attempt to flip the drive over while it is suspended by the wires.

B

A

D

C

A – No space between drive and

washer

B – Spring washer fully closed

C – Space between drive and washer
D – Spring washer open

Figure i.7 Spring Washer

n

Horizontal Suspension of Drive Models 2o0154 to 2o0248 and 4o0156 to 4o0414

To make a wire hanger or frame for use when lifting the drive with a crane, lay the drive in a horizontal position and pass a

wire through the hanging brackets.

i.3 Mechanical Installation

YASKAWA ELECTRIC TOEP C710636 04C U1000 Industrial MATRIX Drive Quick Start Guide

17