Figure 52 start-up procedures screen, Figure 53 start-up procedures, continued, Warning – Liebert 610 User Manual

Page 78: Step 4 (start-up procedure)

Advertising
background image

Operation

72

STEP 4 (Start-Up Procedure)

a. Press the Select pad to put the Master Menu on the LCD. Move the highlighted cursor to

Start-Up Procedures (use the Up and Down pads). Press the Select pad to display the Start-

Up Procedures screen (Figure 52). Return to this screen whenever you need to see the start-

up instructions.

b. Select the Monitor/Mimic Display on the LCD. In the ALARM MESSAGES block (Figure 7),

the only alarms present should be Battery CB Open and Load On Bypass. If any other alarm

messages are present, do not proceed with the UPS start-up. Contact Liebert Global Services

(LGS) for assistance.

c. Select the Walk-In screen on the LCD.
d. To energize the UPS module, manually close the input circuit breaker (CB1, Figure 3). This will

provide power to the rectifier. Use the Walk-In screen to monitor the Module DC Bus voltage.

Figure 52 Start-up procedures screen

Figure 53 Start-up procedures, continued

The Input Amps bars should settle at 25% or less after the momentary inrush current has subsided.
Verify that the DC Voltage bar begins to gradually move to the right.
Verify that the Output Voltage bar moves to the right after the DC Voltage bar has reached the 90%

level. Both bars should settle near the 100% line.
Select the Monitor/Mimic display from the Master Menu and confirm that the module DC bus and AC

output are at their proper operating voltages.

!

WARNING

If any abnormal situation occurs during this walk-in procedure, open the input circuit breaker

and investigate the problem. Each input amps bar should be within 25% of the average bar

length. Call Liebert Global Services if you need help.

START-UP PROCEDURES

1.

Wait approximately two (2) minutes before attempting any other action .

2.

Select "SYSTEM CONFIGURATION" screen to verify that the correct model number is

displayed.

3.

Select "WALK-IN" screen and do the following:

a) Close module input circuit breaker. Verify that the DC voltage bar on

the display begins to gradually move to the right and the AC input current

bars do not move to the right more than 10% (40% for modules

with input filters) after the transformer inrush has subsided.

b) Verify that the output voltage bar moves to the right after the DC

bus bar has reached the 90% point. Both bars should settle near
their respective 100% levels.

NEXT PAGE

MASTER MENU

DOWN :

SELECT :

START-UP PROCEDURES (Cont'd)

c) If anything happens on the display not mentioned in (a) or (b),

immediately open the module input circuit breaker and investigate.

4.

If step 3 is successful, select "MONITOR/MIMIC" screen and verify module

DC bus and output voltages are at proper nominal level. If so, close

module battery circuit breaker.

5.

If bypass or static switch circuit breakers (contactor on xxxxx-xx)

are open, refer to Start-Up Procedures in the UPS Manual for instructions

on closing these breakers.

6.

System is now ready to assume load. Select "LOAD TRANSFER PROCEDURES"

screen for this procedure.

FIRST PAGE

MASTER MENU

UP :

SELECT :

Advertising