PowerWalker WinPower Software V.4.3.0.1 Manual User Manual

Page 38

Advertising
background image

38

Diagram 3-2-13

The function is only for UPS.

The “Schedule Viewer” dialog is used to show the set up UPS Power On/Off and self-test tasks.

“Schedule” dialog contains task list and calendar graphic. Only the tasks of the current month are
displayed in the task list. We use red dot to denote the Power Off action, green dot to denote the
Power On action and blue dot to denote the self-test action in the calendar.

14) "Broadcast Message Settings" Dialog

The “Broadcast Message Settings” dialog can be opened from the “Broadcast Setting” item of

“Tools” menu or click broadcast “Setting” button in “Event Action” Dialog. Refer to the following
diagram 3-2-14.

Advertising